Initial Transmission System Demand Outturn (ITSDO)
This group of pages contains functions to view initial transmission system demand outturn values. The Initial Transmission System Demand Out-Turn is the average megawatt
value of demand for a Settlement Period INCLUDING transmission losses, station transformer load, pumped storage demand and interconnector demand.
The ITSDO is made available by the System Operator within 15 minutes after a Settlement Period, based on their operational metering.
The composition of the Initial Transmission System Demand Out-Turn matches that of the Transmission System Demand Forecast and so ITSDO and TSDF are comparable.
|
The Latest page allows the
user to view the latest initial demand transmission system outturn data.
|
|
The History page allows
the user to view a history of initial transmission system demand outturn data.
|
|
The Download page allows the user
to download a file containing initial demand transmission system outturn data
for a date range.
|
This summary information or data is indicative data only and is derived from balancing mechanism reporting service data (which is copyrighted by ELEXON Ltd who makes it available without warranty).