🏠
ENG
Great Britain >

Initial National Demand Out-Turn (INDO)

This group of pages contains functions to view initial demand outturn values. The Initial National Demand Out-Turn is the average megawatt value of demand for a Settlement Period INCLUDING transmission losses but EXCLUDING station transformer load, pumped storage demand and interconnector demand. The INDO is made available by the System Operator within 15 minutes after a Settlement Period, based on their operational metering. The composition of the Initial National Demand Out-Turn matches that of the National Demand Forecast and so INDO and NDF are comparable.

The 'D/L Embedded' page also allows for the download or more detailed demand information such as levels of emebddeded demand, embedded solar and embedded wind. This gives a better breakdown of demand figures.


The Latest page allows the user to view the latest initial demand outturn data.

The History page allows the user to view a history of initial demand outturn data.

The D/L page allows the user to download a file containing initial demand outturn data for a date range.

The D/L Embedded page allows the user to download a file containing initial demand outturn with embedded data such as wind forecasts and solar forecasts plus embedded demand for a date range.

This summary information or data is indicative data only and is derived from balancing mechanism reporting service data (which is copyrighted by ELEXON Ltd who makes it available without warranty).